1. Measure the site and agree on power
Measure the finished shaft, not just the opening on an old plan. A machine-room-less (MRL) model still needs the right pit, headroom and access for service. Ask what power supply the selected lift needs.
- Match on-site measurements to the supplier's final drawing.
- Confirm the location of lift equipment and safe service access.
- Plan ventilation for equipment spaces in Bangladesh's hot, humid weather.
- Ask what happens during a power cut. Emergency rescue and normal generator operation are different needs.